
One of the biggest news in the railway industry this year is the opening of JR Kyushu's Nishi Kyushu Shinkansen. Making its debut on September 23, the 66km line runs between Takeo-onsen Station in Saga Prefecture and Nagasaki Station in Nagasaki Prefecture. A major redeveloping project around Nagasaki Station is underway, creating excitement in the prefecture. Also, a new tourist train started service along with the shinkansen, and many tourists are expected to visit the area. On the other hand, the national government and Saga Prefecture are still discussing the development of a section east of Takeo-onsen Station that will connect to Fukuoka Prefecture, but no agreement has been made. See the new Nishi Kyushu Shinkansen and the regional revitalization of the line's opening.
-
0m 04s
On September 23, 2022, JR Kyushu's Nishi Kyushu Shinkansen, which connects Saga and Nagasaki Prefectures in the Kyushu region, made its debut.
-
0m 19s
The long-awaited Nishi Kyushu Shinkansen was finally realized, nearly half a century after its inception in 1973.
-
0m 29s
Departure ceremonies were held at the stations, with local government officials and celebrities coming to celebrate the special moment.
-
0m 41s
Many railfans gathered at Nagasaki Station, the western-most terminal, to send off the first train departing at 6:17 am.
-
1m 09s
The first train departed from the eastern-most terminal, Takeo-onsen Station, shortly after 7:00 am.
-
1m 21s
In the Kyushu region, the Kyushu Shinkansen connects Hakata Station in Fukuoka Prefecture and Kagoshima-Chuo Station in Kagoshima Prefecture.
-
1m 32s
The new shinkansen is an addition to the existing Kyushu Shinkansen route.
-
1m 38s
The 66km section runs between Takeo-onsen and Nagasaki Stations in just 23 minutes.
-
1m 52s
With the opening of the Nishi Kyushu Shinkansen, passengers traveling from Hakata Station to Nagasaki take the new conventional limited express train to Takeo-onsen Station,
-
2m 04s
then transfer to the waiting Nishi Kyushu Shinkansen on the same platform.
-
2m 16s
As a result, the new shinkansen makes it possible to travel between Hakata and Nagasaki in as little as 1 hour and 20 minutes, which is 30 minutes faster than before.
-
2m 32s
The Nishi Kyushu Shinkansen uses the brand new "N700S Kamome."
-
2m 39s
The white and red six-car shinkansen was based on JR Central's N700S, which runs on the Tokaido Shinkansen line.
-
2m 59s
The car was designed by industrial designer Mitooka Eiji, who has worked on many tourist trains for JR Kyushu.
-
3m 10s
JR Kyushu asked us to create
a one-of-a-kind train. -
3m 18s
Business trains like the N700S
run from point A to point B. -
3m 25s
So, to make the ride more fun and relaxing,
we added colors and shapes. -
3m 42s
Mr. Mitooka was tasked with designing a "unique, one-of-a-kind" vehicle.
-
3m 47s
The red accent color of the car body is also the corporate color of JR Kyushu.
-
3m 56s
The interior combines classic and modern styles, a fusion of Japanese and Western cultures.
-
4m 19s
I can't wait to see what lies
ahead for the shinkansen. -
4m 22s
I'm so happy.
-
4m 24s
The ride is more comfortable
than conventional trains. -
4m 28s
It was quiet and the seats were clean.
-
4m 39s
In today's program, we are looking at the Nishi Kyushu Shinkansen, which finally opened nearly half a century after its inception.
-
4m 53s
The Kyushu Shinkansen started service in 2011, right?
-
4m 57s
Now the Nishi Kyushu Shinkansen is the latest shinkansen in the Kyushu region, and I understand why the locals are so excited about it.
-
5m 06s
Yes, the local are really hoping that this new Nishi Kyushu Shinkansen will bring in more tourists into the regions along the line.
-
5m 13s
And, especially in Nagasaki Prefecture, there was a very severe dip in the visitors, so the expectations are really really high.
-
5m 24s
Let's see how the Nishi Kyushu Shinkansen is expected to revitalize the regions along the line.
-
5m 34s
With the opening of the Nishi Kyushu Shinkansen, JR Kyushu also started operating a new tourist train, "Two Stars 4047."
-
5m 50s
The three-car tourist train is a refurbished diesel car.
-
6m 00s
Cars 1 and 3, the reserved-seat cars, feature timber seats and window frames.
-
6m 10s
Car 2 is a lounge car.
-
6m 17s
The train was also designed by Mitooka Eiji, the designer of the Nishi Kyushu Shinkansen.
-
6m 27s
Passengers can buy local goodies onboard, like beef bento boxes from Saga Prefecture, green tea, and sweets from Nagasaki Prefecture.
-
6m 40s
To make the journey faster, the mountainous route of the Nishi Kyushu Shinkansen passes through many tunnels.
-
6m 48s
The tourist train, however, follows a more scenic route along the coast.
-
6m 59s
Two Stars 4047 makes one round-trip per day, mainly on weekends and holidays.
-
7m 08s
There are two routes, one in the morning and one in the afternoon.
-
7m 12s
In the morning, the train departs from Takeo-onsen Station and travels on the Nagasaki Main Line along the Ariake Sea, which boasts Japan's largest tidal range.
-
7m 29s
In the afternoon, the train departs from Nagasaki Station and travels along the Omura Line, famous for its calm sea views.
-
7m 38s
The round-trip allows passengers to enjoy different views, there and back.
-
7m 54s
The shinkansen will run from Takeo-onsen
to the mountains of Nagasaki. -
8m 01s
We wanted to extend the effect of the
shinkansen to the surrounding area so we decided to run Two Stars 4047 in a circular
route around the shinkansen line. -
8m 18s
We thought opening the shinkansen and the
tourist train together would be synergistic. -
8m 22s
We hope to attract more visitors to the region so we
are working hard to promote western Kyushu. -
8m 33s
In Nagasaki and Saga Prefectures, where the Nishi Kyushu Shinkansen now runs, locals are working to revitalize their region.
-
8m 46s
The redevelopment around Nagasaki Station is said to be a "once in a century" project.
-
8m 58s
November 2021 saw the opening of "Dejima Messe Nagasaki," a large convention hall.
-
9m 06s
Since it opened, it's been attracting international conferences and large-scale business events.
-
9m 15s
This year we opened a large commercial facility
to coincide with the opening of the shinkansen. -
9m 23s
The station building is scheduled to open next fall.
It will include retail facilities, offices, and a hotel. -
9m 30s
The retail and office buildings will open next fall,
while the hotel is set to open in early 2024. -
9m 45s
Instead of centering the city around the station,
we want the station to become a landmark. -
9m 54s
We hope this landmark will
give new life to the region. -
10m 09s
Also in Nagasaki, buses and taxis have been "wrapped" with images of the Nishi Kyushu Shinkansen and N700S Kamome.
-
10m 19s
The city is working hard to boost the momentum of the new shinkansen.
-
10m 29s
Nagasaki's history and culture were shaped
by its interactions with foreign cultures. -
10m 37s
We hope the shinkansen encourages more people
to come and experience the prefecture's charm. -
10m 50s
We'd love to see the whole region, not just areas
along the shinkansen line, bustling with activity. -
11m 07s
This is Omura City in Nagasaki Prefecture.
-
11m 11s
This city developed around the transportation network branching out from Nagasaki Airport, the first airport in the world to be built on the ocean, and the Kyushu Expressway.
-
11m 27s
Shin-omura Station in Omura City was built to coincide with the opening of the Nishi Kyushu Shinkansen.
-
11m 35s
With convenient transportation and easy access to Nagasaki City, the population of Omura City has been growing by around 500 people per year since 2005.
-
11m 54s
Around the new station, condominiums and four commercial facilities are scheduled to be built, in anticipation of the shinkansen and the additional commuters it will attract.
-
12m 07s
Welcoming the new shinkansen, areas along the Nishi Kyushu Shinkansen line in Saga Prefecture have been making an effort to revitalize the tourism industry.
-
12m 21s
Takeo-onsen Station in Takeo City, Saga Prefecture, is the first station on the Nishi Kyushu Shinkansen Line.
-
12m 32s
A travel-themed bookstore opened by the ticket gate, which offers around 1,000 books on the Western Kyushu region.
-
12m 45s
Local specialties can also be purchased here.
-
12m 51s
There is also a cafe corner, where visitors can pass the time while waiting for the train.
-
13m 02s
Just over from Takeo City, Ureshino-onsen Station was newly built in Ureshino City.
-
13m 10s
It's the city's first railway station.
-
13m 18s
In the future, a famous American hotel company and a major Japanese housing company plan to open new hotels near the station.
-
13m 32s
Ureshino City is known for its hot springs, which have continued flowing for 1,300 years.
-
13m 41s
There is also Ureshino tea, a green tea that was first produced over 500 years ago, and Hizen Yoshida-yaki, pottery which dates back 400 years.
-
13m 53s
In recent years, the city has been working to develop tourism packages that link the local specialties.
-
14m 09s
"Tea tourism" is a new style of tourism that combines the three attractions of Ureshino City.
-
14m 21s
It was started by a group of tea farmers and local inns.
-
14m 26s
Tea producers guide visitors to hot springs and kilns.
-
14m 35s
There are several plans available.
-
14m 37s
One such plan allows you to cycle through the tea fields, and taste tea brewed by tea masters, while enjoying the spectacular views.
-
14m 49s
With the opening of the Shinkansen, efforts to revitalize the city have increased.
-
14m 57s
Ureshino City has been waiting for
a train for almost 100 years. -
15m 03s
We're now getting ready
to welcome visitors. -
15m 12s
To the east is the beautiful Ariake Sea. To the
west is an area famous for its pottery. -
15m 22s
Each region has its charms.
-
15m 25s
We hope visitors will use the city as a hub, branching
out to visit the surrounding areas. -
15m 35s
Yes, Nagasaki and Saga Prefectures, they have some wonderful local travel spots, so I hope that from now on the amount of tourists coming from Japan and also abroad will increase.
-
15m 46s
Indeed.
-
15m 47s
And actually, the city of Fukuoka, is the largest city in the Kyushu islands, so Fukuoka has been called "the gateway to Asia" in the island of Kyushu,
-
15m 59s
but now, we have the Nishi Kyushu Shinkansen opened, which means the access to the city of Nagasaki has improved, then Nagasaki may become the second gateway to Asia in the Kyushu Island.
-
16m 11s
And looking back on history, Nagasaki has been, actually, the only window for the entire Japan to the western world.
-
16m 23s
You mean Dejima Island right?
-
16m 24s
The artificial island that was, between the 17th and 19th century, the only spot for trade with the west right?
-
16m 30s
Yes, that's right, so they have the history there.
-
16m 33s
But looking at the situation of the Nishi Kyushu Shinkansen, especially the section between the Takeo-onsen and Shin-Tosu, you know, nothing has been decided yet, including the route or even whether on not to construct the line at all.
-
16m 53s
Looks like the Nishi Kyushu Shinkansen is facing some challenges.
-
16m 57s
Let's find out what they are.
-
17m 02s
Discussions are currently being held between the national government and Saga Prefecture, regarding development of the line between Takeo-onsen and Shin-Tosu Stations,
-
17m 13s
but an agreement has yet to be reached.
-
17m 15s
The main challenge concerns the building of railway infrastructure known as "full standard."
-
17m 24s
Simply put, "full standard" is shinkansen infrastructure that is the same as most shinkansen throughout Japan.
-
17m 32s
To operate safely at high speeds, "full standard" uses a wider gauge rail, and there are no crossings.
-
17m 40s
The Nishi Kyushu Shinkansen was built using "full standard."
-
17m 45s
A "full standard" track is 1,435 mm wide, about 360 mm wider than conventional lines, meaning the shinkansen cannot connect to conventional lines.
-
18m 03s
If a "full standard" line were constructed between Takeo-onsen and Shin-Tosu Stations, it would run parallel to the conventional line.
-
18m 15s
This would likely reduce the number of limited express services running on the conventional line.
-
18m 22s
Currently, the limited express runs two to three times an hour.
-
18m 27s
The introduction of the shinkansen could also cause fares to increase.
-
18m 43s
The national government wants to extend the shinkansen line.
-
18m 47s
They are petitioning for the building of "full standard" infrastructure.
-
18m 51s
Saga Prefecture, on the other hand, doesn't want a parallel line.
-
18m 55s
They believe it would reduce convenience for local residents.
-
19m 02s
When the Nishi Kyushu Shinkansen opened, a 60-kilometer section of the Nagasaki Main Line between Kohoku and Isahaya Stations became a "parallel line."
-
19m 14s
The number of limited express services at Hizen-Kashima Station dropped from 45 per day to just 14.
-
19m 23s
Kashima City in Saga Prefecture is now concerned about how this will impact the local community.
-
19m 41s
The shinkansen saw limited express services drop
to one-third, which may affect the local economy. -
19m 50s
Currently, the limited express trains, that run on the conventional line between Saga and Hakata, take around 35 minutes.
-
19m 59s
The shinkansen would take just to 20 minutes.
-
20m 02s
However, to develop a "full standard" shinkansen, Saga Prefecture's financial burden is estimated to be around 66 billion yen.
-
20m 16s
Considering the possible inconvenience to local residents and the overall cost, Saga Prefecture insists there is no need for a shinkansen line.
-
20m 30s
We considered the benefits of building
"full standard" infrastructure, however, construction would be costly, and the use
of conventional trains would be limited. -
20m 48s
We need to have a thorough discussion
before we adopt "full standard." -
20m 58s
You would think the opening of a shinkansen would be something the regions would happily welcome, but in the case of the Nishi Kyushu Shinkansen, it seems to be an on-going challenge?
-
21m 09s
Yes, that's right.
-
21m 10s
For example, there are people using local stations who might have the inconvenience after the opening of the new shinkansen, and also a very heavy burden to the financial situation of the Saga Prefecture would also pose a very big trouble,
-
21m 27s
so the situation there is really, really understandable, but on the other hand, the Nishi Kyushu Shinkansen, in the current form, means that the line is isolated from the rest of the shinkansen network,
-
21m 43s
and I don't think this should continue, and the line should be definitely connected to the rest of the shinkansen network, and there are a number of ways to do that.
-
21m 52s
When that's realized, then the connection will bring in a huge additional benefit to the region.
-
22m 03s
At this point in time, it seems to a little bit difficult to satisfy Saga Prefecture and the national government, but I hope that maybe they can come up with new ideas, and find an agreement and come to an agreement in the end.
-
22m 14s
Yes, I do hope so too.
-
22m 23s
On September 12, Yuri Kogen Railway, a third-sector company running in Yurihonjo City, Akita Prefecture, held an unveiling ceremony and a test ride event for the renewal of their tourist train.
-
22m 43s
To bring tourists back following the pandemic, 20 million yen was invested to remodel the train.
-
22m 54s
The windows of the new Nostalgic Train Chokai feature unique designs associated with the route.
-
23m 13s
The interior, which resembles an old-fashioned house, has been designed to evoke warm feelings of nostalgia and home.
-
23m 25s
We want to welcome tourists
back to the region. -
23m 32s
To that end, we've created a train that passengers can
ride while enjoying some old-fashioned comfort. -
23m 44s
After the unveiling ceremony, participants enjoyed a relaxing test ride in the countryside.
-
24m 04s
On September 19, railfans toured facilities along the JR Sekihoku Line, which connects Asahikawa and Abashiri Stations in Hokkaido,
-
24m 15s
to learn about what goes on behind-the-scenes of a railway line.
-
24m 23s
The participants board a special train, which stops at all the signal stations along the way.
-
24m 29s
A guide talks about the history of the facilities along the line.
-
24m 36s
A staff member from JR Hokkaido's maintenance crew explains how it took one week to restore the line after an avalanche occurred four years previously.
-
24m 54s
The participants also enjoy food on the train, such as the crabmeat bento, a well-known "ekiben" sold at Engaru Station.
-
25m 06s
We don't usually get to see signal
stations. It was fascinating. -
25m 13s
We hope by sharing the Sekihoku Line's charms,
more people will become interested in railways. -
25m 32s
Eleven years ago, a section of the JR Tadami Line, which connects Fukushima and Niigata Prefectures, closed after it was washed out by heavy rain.
-
25m 44s
On October 1, the line resumed full operation.
-
25m 54s
In July 2011, a 27-kilometer section of the line, between Tadami and Aizu Kawaguchi Stations in Fukushima Prefecture, was damaged by heavy rain.
-
26m 08s
Flood water washed away the bridges and tracks.
-
26m 18s
At one point, the line was close to being discontinued; however, six years of discussions and more than four years of reconstruction saw the line finally restored.
-
26m 35s
The train makes 3 round-trips per day, as it did prior to the disaster.
-
26m 41s
Today, the first train from Niigata arrives at Tadami Station shortly after 7:00 am.
-
26m 50s
After a brief 10-minute stop, the train starts its journey along the restored section, carrying many railfans and passengers.
-
27m 15s
Locals residents are overjoyed to see the section open again after 11 years.
-
27m 21s
They wave to the train and hold banners that read "Welcome back, Tadami Line!"